Temporary Bus & Vehicular Traffic Route for the LSK Expansion Project
Posted on May 10, 2023
Please be advised that the LSK Expansion Project is planning a wastewater connection beginning May 23, 2023. This scope of work will require a “TEMPORARY” bus route (see attached sketch). Please note, in order to ensure everyone’s safety please KEEP CLEAR of this area as it will be a “CONSTRUCTION ZONE” and do not deviate from the vehicle path as this type of work will require opened trenching. This wastewater connection work will be a phased execution to minimize vehicular traffic flow, bus routing & safety of visitors and crew.
2023 05 02 LSK Expansion Project – Wastewater Connection Work